Electrical Installation Certificate Report (EICR)

Posted on by Gavin

* An EICR should be issued in the event of a New Installation, Alterations or Additions to an existing installation, or a Replacement of a Distribution Board or Consumer Unit.

* An EICR follows a periodic testing and inspection of an installation.

* An EICR should contain schedules of inspections and test results.

* A Minor Electrical Installation Works Certificate (MEIWC) may be issued as long as it does not include a new circuit or replacement distribution board or consumer unit.

* An EICR will list an remedial actions (works) required and istruct you of their importance

This entry was posted in News and tagged . Bookmark the permalink.